Cabinets, Wet-zone Flooring, and Fireplace
This past week, they've been working hard and we now have cabinets, wet-zone flooring (hardwood and vinyl) installed in the house. The fireplace granite surround and mantle were also put in. I must say, I am really happy about the work and even more happier about finally seeing our flooring/cabinet/color selections coming together. They look even better than I had imagined! It took them about a week to get all this done. We now have toilets in the house too but I didn't get any pictures of those or the bathrooms. The upstairs secondary bath is all but done (sans the sink), and the master bath still needs a sink and a glass shower door.
The interior doors have also arrived and are sitting in the garage awaiting installation - they look great!
One thing I'll say after seeing the bathrooms come together is I wish we would've upgraded the master bath to tile and a fully-glass shower. We originally had this selected but cut it out at the last minute trying to save costs, but hindsight is always 20/20 - if we had known then what we know now, we would've kept the upgrades. I guess this will just have to be one of the many projects on my ever-growing list of things to do after closing. Speaking of closing.... we're only two and a half weeks away! Yay!
Here's some pictures we were able to get...
|
kitchen cabinets installed - color is wyoming cherry bordeaux |
|
kitchen from family room... the hardwood is covered (thankfully) but you can see how it will mesh with the cabinets in the this photo |
|
Fireplace granite surround and mantle - got the "tropical brown" granic |
|
cabinets close-up |
|
the kitchen island |
|
full shot of kitchen |
|
interior doors in the garage |
|
beautiful! |
|
family room |
|
close-up of the hardwood and cabinets |
|
another close-up to see how the colors mesh |
|
love it! |
No comments:
Post a Comment
Genuine comments welcome. Backlinks are not.